Product

One record, from the quote to what the job earned.

Four moments in the life of a wrap job, and the rules the product applies at each. Nothing here is a roadmap; every screen exists.

Quote

Price the job. Know what it earns before you send it.

Pick the vehicle and the service. Material comes from the measurement set and your waste percentage. Labor is your hours at your rate. Overhead is allocated the way you set it. The margin is on the screen before the customer sees a number, with a floor you choose.

Material
Square footage comes from the vehicle's measurement set, by panel, with bleed. Waste is a percentage you set per material, or roll-aware if you price by the roll.
Labor
Base hours per service, a complexity factor, and your loaded shop rate. Installers' pay types live in settings, never on the quote.
Overhead
Allocated per labor hour, per bay-day, or as a share of direct cost. The derivation is shown next to the number.
Price
Target margin on fully loaded cost, rounded to your increment. Below the floor, the estimator writes a reason and it is logged.

2024 Porsche 911 GT3

Draft

A. Rivera · Full wrap · Satin black cast film · Q-0142

Material · 318 sq ft incl. 20% waste × $4.25
$1,351.50
Labor · 24.0 h × $40.00
$960.00
Allocated overhead · per labor hour
$400.00
Fully loaded cost
$2,711.50

Price · target margin 35.0% fully loaded

$4,170

Contribution, before overhead

$1,858.50 · 45.0%

Est. profit, fully loaded

$1,458.50 · 35.0%

Above the shop’s 30% floor. No reason required.

Send to customer

Approval

Send it. They approve it on their phone. It becomes a job.

The quote goes out by email or link. The customer sees the price and the scope, not your costs, and approves online. One click converts it to a job. If it goes cold, the follow-up date is on the quote, and a declined quote says why.

What the customer sees
Your shop's name, the vehicle, the services and the price. The page is built from a payload with no cost, hour or margin fields in it.
Approval
One button. The quote moves to Approved, the shop is told, and converting it to a job freezes the figures as the baseline.
Follow-up
Every open quote carries a next follow-up date. A declined quote records the reason.
Leads
Inquiries from your form land as leads. One click starts the quote.
N

Northline Wraps

northline.form001.com/q/…

2024 Porsche 911 GT3

Prepared for A. Rivera

Full wrap

Satin black cast film, all painted panels.

$4,170.00

Total (pre-tax)$4,170.00
Approve this quoteExpires in 14 days

In the bay

Every job has a bay, a date and a crew. Installers see the work, not the money.

An approved job gets a bay, planned dates and installers. A bay holds one car at a time and the system refuses a double booking. Installers open the job on a phone: vehicle, services, bay, three actions. Hours and material are logged as they happen, rework flagged.

The plan
Bay, planned dates and crew on every approved job. A bay holds one car at a time; the system refuses a double booking.
The phone
Installers open their jobs on a phone: vehicle, services, bay, and three actions. There are no prices on that surface, and a test proves it on every release.
Logging
Hours and material are logged against the job as they happen. Any entry can be flagged as rework.
Deposits
A deposit can be recorded against the job. Invoicing stays in your current tool.

2024 Porsche 911 GT3

In progress

A. Rivera · Full wrap · J-0087 · from Q-0142

Baseline frozen at conversion · $4,170 · 24 h · 318 sq ft

Bay

Bay 2

Planned

Dec 9 – Dec 11

Crew

M. Chen, D. Okafor

Bay 2 is taken Dec 10 by J-0088. Double booking refused.

Earned

Close the job. See what it made, line by line.

Estimate against actual for material, labor and overhead, on the job page when it closes. Reports by service, estimator and installer. Everything exportable as CSV.

Close
Estimate against actual for material, labor and overhead, line by line, with overhead at actual drivers or held at estimate.
Two margins
Contribution before overhead and profit fully loaded are always shown separately.
Reports
Margin, labor accuracy and material variance by service, estimator and installer.
Export
Every table as CSV in one zip, whenever you like.

Close job

2024 Porsche 911 GT3 · A. Rivera · Full wrap · J-0087

Invoiced $4,170.00 · 29.0 h logged · 340 sq ft used

FigureEstimatedActualVariance
Material · 318 → 340 sq ft$1,351.50$1,445.00−$93.50
Labor · 24 → 29 h$960.00$1,160.00−$200.00
Overhead · at actual drivers$400.00$483.33−$83.33
Revenue · invoiced$4,170.00$4,170.00+$0.00
Contribution, before overhead$1,858.50 · 45.0%$1,565.00 · 37.5%−$293.50
Profit, fully loaded$1,458.50 · 35.0%$1,081.67 · 25.9%−$376.83
Five extra hours and twenty-two extra square feet.Close job

Margin by estimator

Closed jobs · last 90 days · full wraps

CSV
EstimatorJobsEst. marginActual
R. Alvarez1436.1%31.4%
J. Park1135.0%34.2%
S. Whitfield933.8%24.6%

Illustrative names and figures. Filters by service, estimator and installer.

Pricing policy

Applies to every estimator

Method
Target margin, fully loaded
Target margin
35%
Floor
30%, reason required
Overhead
Per labor hour
Rounding
$5

Pricing below the floor is logged with who, when and why.

What is not in the product

We would rather do five things properly.

These are deliberate. Each has a good tool already, and pretending otherwise would make the five things above worse.

A scheduling calendar
Jobs have a bay, planned dates and a crew, and double bookings are refused. There is no calendar view.
Invoicing or payments
A deposit can be recorded against a job. Invoices and card payments stay where they are today.
A replacement for your CRM
Customers, leads and quotes live here. Marketing email and pipelines stay in HubSpot or whatever you use.
Tax
Every price is pre-tax.
Promises about savings
The reports show what each job earned. What you do with that is yours.

Set your rates, price one job, see what it earns.

Free during the pilot. Your data is yours to export at any time.